Loudoun Gateway Data Center Development

OpenRule 506(c)Accredited investorsSingle asset (LLC)
Data centers

Summary

Ground-up development of a 36 MW powered-shell data center campus in Northern Virginia, with 24 MW pre-leased to an investment-grade hyperscale tenant on a 15-year lease.

Highlights

  • Utility power agreement secured for the full 36 MW
  • Two-thirds of capacity pre-leased before construction start
  • Exit planned via sale to a core data center REIT or infrastructure fund after stabilization

Key terms

Offering typeRule 506(c), Regulation D
StructureSingle asset (LLC)
Target return19% target IRR
Minimum investment$100K
Raise size$45M
Term4 to 6 yrs
DistributionsAt stabilization, then quarterly
Final closeDec 12, 2026
Critical IT load36 MW (24 MW pre-leased)
TenantInvestment-grade hyperscaler, 15-yr triple-net lease
Construction loan60% loan-to-cost, floating rate
Promote20% over 8% pref, 30% over 18% IRR

Risks

Private placements are illiquid, speculative, and may lose some or all of the capital invested. Targets are not guarantees. Read the Private Placement Memorandum in the data room before investing.